View Single Post
  #30  
Old 12th April 2021, 08:32 AM
MikkiJayne MikkiJayne is offline
Senior Member
 
Join Date: Jan 2012
Posts: 5,017
Default

I'm getting as much as I can done to it in the couple of weeks I have between projects, using parts I already have and not spending much any money on it. The aim is to get an MoT on it and just drive it about, then I can assess all its foibles and deal with them on a slower timescale, in between other jobs. The longer it stays with me, the better it gets. At some point it will get a machine polish, engine-out service, subframe refurbs, etc.

20 hours on it so far.

Parts used:

PS hoses (refurb)
PS hose brackets (used)
NSF upper rear arm (used)
NSF lower rear arm (used)
NSF wheel bearing (used)
Reply With Quote