barzya8
7th November 2020, 02:22 PM
Hi All
Thought I would update you all on some of the work recently carried out on my car.
1. Replaced oil cooler, coolant pipe. The one that eventually fails in between engine and oil cooler.
Replaced with a Billet Aluminium one from the USA
2. New Cambelt, pullies, tensioners & water pump and thermostat
3. New ancillary serpentine belt and pully
4. Re fitted my original repacked catalytic converters. Had these repacked in Germany. Total including postage £750
I now have two spare after market Catalytic converters if any one is interested.
5. Full car detail with Ceramic coating finish, including FE Wheels :cool:
6. New MOT yesterday - Pass with no advisories :D
Quite an expensive last three months.
The car is definitely worth the investment though
All done just in time for the 2nd Lockdown - Happy Days :mad::(
Keep safe everyone
Thought I would update you all on some of the work recently carried out on my car.
1. Replaced oil cooler, coolant pipe. The one that eventually fails in between engine and oil cooler.
Replaced with a Billet Aluminium one from the USA
2. New Cambelt, pullies, tensioners & water pump and thermostat
3. New ancillary serpentine belt and pully
4. Re fitted my original repacked catalytic converters. Had these repacked in Germany. Total including postage £750
I now have two spare after market Catalytic converters if any one is interested.
5. Full car detail with Ceramic coating finish, including FE Wheels :cool:
6. New MOT yesterday - Pass with no advisories :D
Quite an expensive last three months.
The car is definitely worth the investment though
All done just in time for the 2nd Lockdown - Happy Days :mad::(
Keep safe everyone